Lost Time Injury Rate

A severity-focused safety rate that pairs with TRIR. LTIR counts injuries with days away; TRIR includes broader recordables.

LTIR = (LTI count × 200,000) ÷ total hours worked.

Tip: Keep “Lost-Time Injuries” and “Hours Worked” on the same basis (period, units, and population) before calculating Lost Time Injury Rate.

Cluster: Construction hub · Safety TRIR · CPI · SPI · Percentage guide

Lost-time injury rate (LTIR) scales lost-time injuries per 200,000 hours worked.

Enter lost-time injuries and hours worked for the same period.

Number of LTIs
Total employee hours worked

LTIR

Understanding Lost Time Injury Rate

How we calculate. LTIR = (LTI count × 200,000) ÷ total hours worked. The form uses the same arithmetic as the worked examples on this page. See our methodology and accuracy policy.

Real-world scenario: A typical Lost Time Injury Rate case uses lost-time injuries 1 and hours worked 400000. Enter the same figures below to reproduce the worked path.

What is Lost Time Injury Rate?

A severity-focused safety rate that pairs with TRIR. LTIR counts injuries with days away; TRIR includes broader recordables.

  • LTI definition per safety policy
  • Same hours base as TRIR when comparing
  • Result is a rate, not a percent

The Formula

Lost Time Injury Rate
LTIR = (Lost-time injuries × 200,000) ÷ Hours worked

Worked Example

Scenario: 1 LTI; 400,000 hours worked.
Step 1: (1 × 200000) ÷ 400000 = 0.5
Answer: LTIR is 0.5.

Common Use Cases

  • Safety scorecards: severity rate
  • Prequalification: LTI history
  • Project reviews: TRIR vs LTIR

Pro Tips

  • Align LTI criteria with insurer/owner
  • Report beside TRIR
  • Not a substitute for legal reporting

Limitations: Lost Time Injury Rate results are educational construction planning aids—not engineering, safety, legal, or cost-estimating advice. Confirm definitions with your project controls, safety, and contract documents. For earned-value SPI/CPI see the Professional hub.

FAQ

LTIR vs TRIR?

TRIR counts recordable incidents; LTIR counts lost-time injuries only. Both often use the 200,000-hour scale.

What if hours worked is 0?

LTIR is undefined—enter positive hours worked.

Authoritative References

For construction project controls and safety rate concepts, consult:

  • OSHA — workplace safety resources
  • PMI — project management practices
  • AIA — contract and project delivery context